公立大学法人大阪市立大学
Facebook Twitter Instagram YouTube
Personal tools
公立大学法人大阪市立大学
News

Science building and Zelkova street construction completed!

Published on Jan 27, 2014

University

Science facilities construction

The construction of the new science facilities was fully completed on 31 January 2014.?All laboratory instruments and equipment will be carried in and installed in time for the?official opening in April. ?

■?? Outline of new facilities

  1. Phase 1 (Science Faculties General Experiment Building) construction
    ???? Steel-reinforced concrete (partly steel framed)
    ???? 7 floors above ground, 1 basement floor. Total floor space 7,089.43m2
    ???? Completion date: 31 July 2012
  2. Phase 2 construction
    ???? (1) A-building
    ???? Reinforced concrete
    ???? 3 floors above ground, 1 basement floor and 1 rooftop mechanical floor.?
    ???? Total floor space 3,232.27m2
    ???? (2) B-building
    ???? Reinforced concrete
    ???? 3 floors above ground. Total floor space 1,657.27m2
    ???? Completion date of both parts: 31 January 2014

学舎新築工事
Impression of completed building

Zelkova Street

完成イメージ図はこちらAs part of the construction work for the new science facilities OCU has replaced the Faculty of Science building, carried out earthquake resistance construction work and redesigned the street in front of the facilities. All work was completed by the end of January 2014.

The finishing touches are now being made to the redesigned Zelkova Street. A model will be on show on the ground floor of the Media Center until the end of February.

完成模型 完成模型
Model made by students of the Faculty of Human Life Science

このカテゴリー内のナビゲーション